Tag: Hyderabad Infrastructure

Musi Riverfront to be Developed in the Lines of Necklace Road

9 Oct 11: GHMC is coming up with a makeover plan of the Musi riverfront between Puranapul to Nagole with an estimated budget of Rs.200 to 250 crore. It is planning to make this stretch a tourist destination as similar…

Flyovers in the City to be More Safe

28 Jul 11: Keeping in view the increasing number of accidents on flyovers, GHMC in association with city’s traffic department has decided to fix glow studs and cat eyes on flyovers and approach roads leading to them. It was found…

City’s Road Infrastructure Cannot Support the Growing Traffic Demands

25 Jul 11: Institute of Urban Transport (India), in a presentation ‘Traffic and Transport Problems and Prospects of Hyderabad Metropolitan Area’, has said that the current road network in the city is very much inadequate to meet the rising demands…

City to get one of the Best Amateur Public Observatories in the Country

23 Jul 11: Birla Science Center is setting up a public observatory named G.P.Birla Observatory, which is being considered as one of the best public observatories in the country for amateurs. The construction work of this observatory is almost completed…

City Flyovers Need Immediate Repairs

22 Jul 11: Recent periodic inspections of 45 flyovers conducted by GHMC has revealed that hair line cracks have appeared on around five flyovers. Apart form that, several flyovers were found with damaged bearings and loosened expansion joints. The officials…

Secunderabad Cantonment Board to Repair the Damaged Roads

4 Jun 11: The SCB is taking all the necessary actions to give facelift to the damaged roads in its area, in wake of upcoming monsoon season. The roads which are in a bad shape with no dividers and reflectors…

City Roads in Terrible Condition Ahead of Monsoon Season

5 May 2011: The Roads and Building Department (R&B) department is now facing a challenge to improve 150-160 kms of the 200 kms stretch road that is being maintained by the department. This road stretch is really in a bad…

Pay Toll to Ride on ORR

07 April 2011: Out of the total stretch of 158km of Outer Ring Road (ORR), 62 km of roads are done with construction. The HMDA had finalized toll rates for this completed portion of ORR, based on the travel distance.…